|
Region 43
800 MHz meeting materials (agendas, minutes, and slides), 800 MHz Docs, 800 MHz Plan Revision Draft Versions and 800 MHz Re-Banding
Note:
PDF documents require Adobe
Acrobat Reader.
Recent additions:
- Wave 4, Stage 1 rebanding update; FCC Public Notice DA 07-1542 (115 KB PDF, March 30, 2007)
- NPSPAC Region 43 rebanding recommendations (PDF, 219KB, dated March 21, 2007)
- Committee
Members (PDF, 11KB, revised Jan. 31, 2007)
- Region 43 800 MHz
Regional Review Committee Roster (RPC Roster) (PDF, 25KB, Revised March 27, 2006)
- Meeting slides for all meetings are now on the Meeting Materials page.
- Region 43 800 MHz Plan (547KB PDF, Draft Version #2 of the re-write of the Region 43 800 MHz Plan, 3/27/06)
- FCC Letter to Amend Plan to End Filing Windows (18KB PDF)
- FCC Letter to Amend Plan to End Zone Representatives (27KB PDF)
- BDA usage and current FCC rule changes/enforcement petition (532KB PDF)
800 MHz
Reconfiguration Information
800 MHz Document Library |
|
Document Download |
Document
Descriptions |
2007 |
| Wave 4, Stage 1 rebanding update; FCC Public Notice DA 07-1542 (115 KB PDF) |
On March 30, 2007 the FCC:
- Extended the Wave 4, Stage 1 mandatory negotiation period by 90 days from April 2, 2007 to July 1, 2007;
- Postponed the beginning of the mediation period for these licensees until July 2, 2007 and;
- Extended the filing freeze on new applications in Wave 4, Stage 1 until August 13, 2007.
See FCC Public Notice DA 07-1542 for details. |
| Committee
Members (11KB
PDF) |
This is a
listing of the Committee members with complete contact information. |
2006 |
| Meeting slides |
Slides for all meetings are now on the Meeting Materials page. |
| RPC Roster (25KB PDF) |
Region 43 800 MHz
Regional Review Committee Roster, revised March 27, 2006 |
2005 |
| BDA usage and current FCC rule changes/ enforcement petition (532KB PDF) |
This is the presentation by Jack Daniel at the November 2005 NPSTC meeting regarding BDA usage and the current FCC petition for rule changes and enforcement. |
|
Channel
List Sorted by Channel (119KB
PDF) |
This is the listing of 800 MHz channel
assignments, sorted by channel number, that have been approved by
the Committee through their April 2005 meeting.
|
2004 |
| Motorola
November 2004 Communicator
(66KB PDF) |
Motorola's Spectrum Strategy Team
Newsletter. |
| Sample
Public Safety Agency Information
(43KB DOC) |
This is a sample of the types of data
that will need to be collected on systems to prepare to enter into
rebanding negotiations. |
| I-CALL
/ I-TAC Interoperability Training Program
(2MB PPT) |
This is a PowerPoint presentation
that outlines the deployment and usage strategies for ICALL and
ITAC repeaters in the State of Connecticut. |
| |
This is a text-only
copy of the plan which was last revised in 1993. The Committee is
currently debating a plan revision in 2002 and a draft of that work
will be posted to this site when it is developed. |
| |
The By-Laws were last
revised in 1993. The Committee is currently debating By-Laws revisions
in 2002 and a draft of that work will be posted to this site when
it is developed. |
|
The Application
Review Procedures were originally adopted in 1993 and modified in
1994. The Committee is currently debating revisions to the Procedures
in 2002 and a draft of that work will be posted to this site when
it is developed. |
|
This is
the FCC NPRM on interference in the 800 MHZ band. |
| |
|
| |
|
| Region 43 800 MHz Plan (547KB PDF) |
Draft Version #2 of the re-write of the Region 43 800 MHz Plan, 3/27/06 |
| FCC Letter to Amend Plan to End Filing Windows (18KB PDF) |
March 27, 2006 letter re: RE: Region 43 800 MHz NPSPAC Plan – PR Docket 91-270 |
| FCC Letter to Amend Plan to End Zone Representatives (27KB PDF) |
March 27, 2006 letter re: Region 43 800 MHz NPSPAC Plan – PR Docket 91-270 |
Region 43 800 MHz Plan (301KB DOC) | Draft Version #1 of the re-write of the Region 43 800 MHz Plan |
|
|
| 800 MHz Re-Banding |
| NPSPAC Region 43 rebanding recommendations (PDF, 219KB) |
March 21, 2007 letter to the FCC and State Department with rebanding recommendations from Region 43. |
| TA
Filing Setting Dates for Wave 4 (225KB
PDF) |
TA Letter clarifying
Wave 4 Schedule (still contingent on treaty finalization) |
| TA
Slides - January 2005 APCO Symposium (1MB
PDF) |
Presentation
by TA at APCO January Symposium outlining the Wave process and schedule |
| SIEC
Response letter to TA (180KB
PDF) |
SIEC letter
to the Transition Administrator in response to their December 20th
letter of inquiry. |
| Response
to inquiry from Transition Administrator (146KB
PDF) |
Region 43 letter
to the Transition Administrator in response to their December 20th
letter of inquiry. |
|
800
MHz FCC Supplemental Order and Order on Reconsideration 12-22-04
(404KB PDF) |
Federal Communications Commission Supplemental Order and Order on
Reconsideration. Released: December 22, 2004. |
|
800 MHz Band Plan Structures in Region 43
(618KB PPT) |
Slide deck showing the current and potential future band structures
for Region 43. |
|
Bearing Point Letter (496KB
PDF) |
The December 20th letter from the Transition Administrator (TA)
requesting information about systems in the Region. |
|
TAPSR Prioritization Press Release 12-21-04 (15KB PDF) |
The TA Press Release related to the December 20th letter. |
|
|